/

PPAP automation · Supplier part approval software

Motor manufacturing

Automate PPAP submission checks before part approval.

Your quality engineers manually check supplier PPAP submissions for missing documents and results that do not meet part specifications. Noxus automates these checks, requests supplier corrections and prepares the findings for your engineer’s decision.

Process walkthrough

From PPAP submission
to an approval decision.

Check the required documents and test results, return specific issues to the supplier, and record your engineer’s decision.

  1. 01

    Receive the submission

    Receive PPAP submissions through your supplier portal, SharePoint or email. Identify the part, supplier, engineering revision and submission level to determine which documents and test results are required.

  2. 02

    Check documents and test results

    Check dimensional results against the drawing tolerances. Review material certificates, control plans and process records against the applicable part revision, using PLM records and supplier data from your ERP.

  3. 03

    Request supplier corrections

    Separate missing documents from measurements outside tolerance. Send the supplier the specific issues to resolve and identify the documents or test results that need resubmitting.

  4. 04

    Prepare and record the decision

    Bring the findings for each PPAP element into one assessment for the engineer. Record their approval, rejection or resubmission request against the part and supplier in your ERP.

Kirchhoff Automotive logo

PPAP submissions checked and approved, live in 50 days

PPAP submissions checked and approved, live in 50 days

PPAP submissions checked and approved, live in 50 days

Kirchhoff Automotive runs Noxus inside its own ERP to validate incoming PPAP elements and supplier documentation against specification, writing each outcome back with the audit trail intact.

Read the customer story

50 days

From project start to deployment

85%

Submissions processed straight through

80%

Cycle time reduction from document to ERP

Connected systems
and process controls.

See where the process gets its information, which records it updates and when a person needs to review a case.

Connected systems
  • Inputs and channelsReceive requests, documents and data from connected channels and systems.
  • Systems of recordUse the records and reference data already maintained by your teams.
  • System updatesWrite results, statuses and supporting information back to the relevant systems.
Explore integrations
Process controls
  • Decision rulesDefine what can proceed automatically and what requires human review.
  • TraceabilityRetain the inputs, checks, actions and approvals behind each outcome.
  • MonitoringTrack processing times, exceptions and cases awaiting review.
Explore agent execution

Frequently asked

Questions about PPAP submission review

How long does it take to deploy?

Typically around 50 days from kickoff to the first process live in production. Scoping maps your PPAP levels, customer-specific requirements and the systems where submissions and approvals live.

Which systems does it connect to?

Your supplier portal, SharePoint or mailboxes for submissions, your PLM for drawings and specifications, and your ERP or QMS where the approval decision is recorded.

Which PPAP elements are checked?

Each element required for the part’s submission level, including dimensional results against drawing tolerances, material certifications, control plans, PFMEA and the part submission warrant.

What happens when a submission is incomplete?

Missing documents and out-of-tolerance measurements are separated and sent back to the supplier as specific corrections, so they fix exactly what is needed.

Does Noxus approve parts?

No. Your supplier quality engineer makes the approval decision from one consolidated assessment. Noxus prepares it and records the decision.

Where does the platform run?

Inside your own infrastructure, typically on a VM in your environment. Data does not leave your estate and every action is logged.

Have a specific question? Talk to us

Improve one critical process.
Build the case for transformation.

Scope the return, map the work and get the first process running. Expand with measured results.

First process live in eight weeks

  1. Assess process costs and potential savings. Agree the first scope, expected return and delivery plan.

  2. Define the steps, exceptions and human approvals. Prepare system access and platform deployment with IT.

  3. Connect your systems, test with your team and launch. Measure processing time, quality and cost against the baseline.

  4. Prioritize further processes from production results. Reuse integrations and components, supported by your teams and our partners.

  1. Assess process costs and potential savings. Agree the first scope, expected return and delivery plan.

01 · Scope

Delivered by Noxus or our implementation partners

KPMG
PwC
Devoteam

Bring one critical process.

For example: Supplier part approval (PPAP), Quality non-conformance and CAPA handling, Accounts payable invoice processing, Supplier quality documentation handling, Automotive claim management, Freight loss and damage claim preparation, Shipment status enquiry resolution.

Talk to a process expert